CHRISTOPHER
ANDERSON | CEO XIMEN

CHRISTOPHER  ANDERSON |  CEO XIMEN

We are now into the first 200 days of a major Gold bull market, Ximen is in control and owns 100% of a very large epithermal gold district in southern BC, which has proven to deliver multiple high grade intercepts, backed up with a successful high grade bulk sample. Things are looking very encouraging.

Summary of the 2014 program presented at the 2015 Keg Conference outlining the previous year's work and discoveries.

XIMEN PRESENTS AT THE KEG CONEFRENCE

Designed to define and confirm the orientation of the high-grade mineralized shoots identified in the previous drill programs.

JULY 2016 NEW DRILL PROGRAM INITIATEAD

JULY 2016 NEW DRILL PROGRAM INITIATED

In the midst of an extremely depressed market, Ximen raises $1,000,000 and pays off all of its properties. This transaction makes Ximen Mining Corp the 100% owner of the Brett gold project.

XIMEN MAKES FINAL PAYMENT FOR BRETT

XIMEN MAKES FINAL PAYMENT FOR 100% OF BRETT GOLD PROJECT

Regional exploration program inspires Ximen to assemble District size land position via staking and acquisition.

JULY 2014 XIMEN EXPANDS CLAIM

JULY 2014 XIMEN EXPANDS CLAIM

In Exchange for expenditure, the property is split 50/50 ownership between two junior explorers. The first 43-101 is completed.

2000-2004 JV BETWEEN 2 JR EXPLORERS

2000-2004 JV BETWEEN 2 JR EXPLORERS

Prospector Alf Brewer discovered two narrow gold-bearing quartz veins within the Okanagan batholith. The veins are exposed on the lower slope of a steeply incised gully and are relatively inaccessible.

1939 GOLD IN THE OKANAGAN!

1939 GOLD IN THE OKANAGAN!

Chip sample from RW vein exposed during road construction assayed 62.9 gms Au/T over a width of 1.4 m.

1985 PROSPECTING AND ROAD CONSTRUCTION

1985 PROSPECTING AND ROAD CONSTRUCTION

Charlie Brett discovers coarse angular gold in Whiteman Creek and its south flowing tributaries.

1983 BRETT GOLD FOUNDED

1983 BRETT GOLD FOUNDED

Discover the rich history and incredible potential of the Brett Gold Project in British Columbia.

BRETT GOLD PROJECT

SCROLL TO DISCOVER

2016

2015

2014

1994

1983

1939

BRETT GOLD PROJECT

Ximen assembles a geological team that has specialized in epithermal deposits to complete a regional compilation of previous data and intensive exploration program.

JAN-MAY 2014 XIMEN ASSEMBLES A-TEAM

JAN-MAY 2014 XIMEN ASSEMBLES A-TEAM

795 meters of drilling confirms RW vein was a splay off main shear zone. Visible gold in samples as high as 13.7 gms Au/T. 25 significant intersections.

1986 SIXTEEN NQ DIAMOND DRILL HOLES

1986 SIXTEEN NQ DIAMOND DRILL HOLES

2900 meters of drilling. Grades as high as 82.19 gms Au/T.

1987 THIRTY TWO NQ DIAMOND DRILL HOLES

5,737 meters of diamond drilling and 2,834 meters of RC drilling completed. Grades as high as 69.6 gms Au/T.

1988 DIAMOND AND RC DRILLING COMPLETED

1988 DIAMOND AND RC DRILLING COMPLETED

291 tonne bulk sample was shipped to the Cominco smelter at Trail for processing. Values recovered by the smelter averaged 27.74 gms Au/ tonne and 63.7 gms Ag / tonne. Low sulfide mineralization, visible metallurgy, 95% gold recovery.

1995 - 291 TONNE BULK SAMPLE EXCELLENT RECOVERY

1995 - 291 TONNE BULK SAMPLE EXCELLENT RECOVERY

24 trenches were excavated to bedrock and sampled along the Main Shear Zone, showing areas of excellent potential.

1993 - TRENCHING AND SAMPLING

1993 - TRENCHING AND SAMPLING

Work completed consisted of 360 meters (1200 feet) of underground development.

1994/1995 - UNDERGROUND DEVELOPMENT

1994/1995 - UNDERGROUND DEVELOPMENT

‍‍‍1986

1988

Ximen drills a total of 13 holes for 2977 m in new areas and discovers two new zones with results that included 34.18g/t gold over 0.9m and 16.7g/t gold over 1.5m.

SEPT 2014 TARGETTED DRILLING UNDERWAY

SEPT 2014 TARGETTED DRILLING UNDERWAY

Ximen drills a total of 13 holes for 2977 m in new areas and discovers two new zones with results that included 34.18g/t gold over 0.9m and 16.7g/t gold over 1.5m.

With neither party willing to invest 100% of the resources while the other reaps half the benefit, a stalemate develops and little work is done.

2004-2011 STALEMATE OVER EXPENDITURES ENSUES

2004-2011 STALEMATE OVER EXPENDITURES ENSUES

One of the junior partners pays $1,000,000 in cash and $1,000,000 in stock to purchase the other 50% of the Brett gold project.

2011-2013 $2MM TO BUY COMPLETE OWNERSHIP

2011-2013 $2Mil TO BUY COMPLETE OWNERSHIP

Ximen enters into an arrangement to pay $1,000,000 in cash and $600,000 in shares over the course of the terms.

DEC 2013 XIMEN STRIKES DEAL: $1.6Mil TO BUY 100% OF THE BRETT GOLD PROJECT

DEC 2013 XIMEN STRIKES DEAL: $1.6Mil TO BUY 100% OF THE BRETT GOLD PROJECT

2011

2900 meters of drilling. Grades as high as 82.19 gms Au/T.

1987 THIRTY TWO NQ DIAMOND DRILL HOLES

Summary of the 2014 program presented at the 2015 Keg Conference outlining the previous year's work and discoveries.

XIMEN PRESENTS AT THE KEG CONFRENCE

2004

Ximen successfully completes 16 holes, totalling 2400 meters. Further assay results pending.

NOV 2015 XIMEN ANNOUNCES SELECTIVE SAMPLE RESULTS

NOV 2016 XIMEN ANNOUNCES SELECTIVE SAMPLE RESULTS

STAY UP-TO-DATE ON XIMEN

Get the latest news on Ximen Mining Corp: Drill results, project updates and industry news will be immediately released to email subscribers.

STAY UP-TO-DATE ON XIMEN

LEGAL & TRUST CO.

GOLD

CONTACT

MANAGEMENT