May 29, 2020

Press Release

Ximen Mining to Install Culvert for Kenville Portal

Vancouver, B.C., May 29, 2020 – Ximen Mining Corp. (TSX.v: XIM) (FRA: 1XMA) (OTCQB: XXMMF) (the “Company” or “Ximen”) is pleased to announce it is proceeding with refurbishment of the 257 Level existing portal at the Kenville mine in the Nelson mining camp in southern British Columbia. The Company recently purchased a steel culvert for installation at the site. Once the sections are assembled it will be transported to the site in early June.

The new steel culvert is approximately 3 meters in diameter and 10 meters in length and is constructed of sections that are bolted together. It will be installed at the rock face and will extend outward with engineered back fill placed on either side (see figures below).

Dr. Mathew Ball, P.Geo., VP Exploration for Ximen Mining Corp. and a Qualified Person as defined by NI 43-101, approved the technical information contained in this News Release.

Investor Relations: Sophy Cesar, 604-488-3900, ir@XimenMiningCorp.com

On behalf of the Board of Directors,

Christopher R. Anderson,
President, CEO and Director
604 488-3900

Investor Relations: Sophy Cesar, 604-488-3900, ir@XimenMiningCorp.com


Get the latest news on Ximen Mining Corp: Drill results, project updates and industry news will be immediately released to email subscribers.


Projects Reports Investors

Unearth what makes us unique

A Solid Mining Company with Strong Ties to British Columbia

Learn More About Ximen Mining Corp